The kit includes two stands of different shape: in the form of Ballerina and in the form of Tree of Luck for bracelets
If you require a DCC Decoder for this model
On the railways marshalling yards gave way to intermodal depots as containers are transferred between ships
A total number of 49 Class 73’s were built between 1962 and 1967 and most of them can still be seen running up and down the southern region
12x 2-wire LMS/BR Ground Signal – A pack of 12 x 3-lamp plug and play signals in 4mm scale (OO)
2411 Network SouthEast Mk2 Brake Second Open (BSO) GWR-Livery The kit includes two standsBuilt between 1964 and 1975, the MK2 coaches were one of the highest number of coaches built for British Railways. These coaches were used all over the country by lots of different operators including Scot Rail, Network SouthEast, BR and even Network Rail. Seven different classes of coach were made using the MK2 design (MK2, MK2A, MK2B, MK2C, MK2D, MK2E and MK2F), each with their own unique characteristics and additions to the original design. Other